IndiaBIX.com
Arithmetic Aptitude Data Interpretation
Logical Reasoning Verbal Reasoning Non Verbal Reasoning
General Knowledge
Sudoku Number puzzles Missing letters puzzles Logical puzzles Playing cards puzzles Clock puzzles
C Programming C++ Programming C# Programming Java Programming
Microbiology Biochemistry Biotechnology Biochemical Engineering
Civil Engineering Mechanical Engineering Chemical Engineering Networking Database Questions Computer Science Basic Electronics Digital Electronics Electronic Devices Circuit Simulation Electrical Enigneering Engineering Mechanics Technical Drawing
Placement Papers Group Disucssion HR Interview Technical Interview Body Language
Aptitude Test Verbal Ability Test Verbal Reasoning Test Logical Reasoning Test C Programming Test Java Programming Test Data Interpretation Test General Knowledge Test
Data Structures Operating Systems Networking DATABASE Database Basics SQL Server Basics SQL Server Advanced SQL Server 2008 JAVA Core Java Java Basics Advanced Java UNIX Unix File Management Unix Memory Management Unix Process Managemnt C Interview Questions The C Language Basics .NET Interview Questions .NET Framework ADO.NET ASP.NET Software Testing

Operating Systems - Interview Questions and Answers

@ : Home > Technical Interview > Operating Systems > Interview Questions

1. Explain the concept of Reentrancy?

It is a useful, memory-saving technique for multiprogrammed timesharing systems. A Reentrant Procedure is one in which multiple users can share a single copy of a program during the same period. Reentrancy has 2 key aspects: The program code cannot modify itself, and the local data for each user process must be stored separately. Thus, the permanent part is the code, and the temporary part is the pointer back to the calling program and local variables used by that program. Each execution instance is called activation. It executes the code in the permanent part, but has its own copy of local variables/parameters. The temporary part associated with each activation is the activation record. Generally, the activation record is kept on the stack.
Note: A reentrant procedure can be interrupted and called by an interrupting program, and still execute correctly on returning to the procedure.

2. Explain Belady's Anomaly?

Also called FIFO anomaly. Usually, on increasing the number of frames allocated to a process virtual memory, the process execution is faster, because fewer page faults occur. Sometimes, the reverse happens, i.e., the execution time increases even when more frames are allocated to the process. This is Belady's Anomaly. This is true for certain page reference patterns.

3. What is a binary semaphore? What is its use?

A binary semaphore is one, which takes only 0 and 1 as values. They are used to implement mutual exclusion and synchronize concurrent processes.

4. What is thrashing?

It is a phenomenon in virtual memory schemes when the processor spends most of its time swapping pages, rather than executing instructions. This is due to an inordinate number of page faults.

5. List the Coffman's conditions that lead to a deadlock.

  1. Mutual Exclusion: Only one process may use a critical resource at a time.
  2. Hold & Wait: A process may be allocated some resources while waiting for others.
  3. No Pre-emption: No resource can be forcible removed from a process holding it.
  4. Circular Wait: A closed chain of processes exist such that each process holds at least one resource needed by another process in the chain.

6. What are short, long and medium-term scheduling?

Long term scheduler determines which programs are admitted to the system for processing. It controls the degree of multiprogramming. Once admitted, a job becomes a process.

Medium term scheduling is part of the swapping function. This relates to processes that are in a blocked or suspended state. They are swapped out of real-memory until they are ready to execute. The swapping-in decision is based on memory-management criteria.

Short term scheduler, also know as a dispatcher executes most frequently, and makes the finest-grained decision of which process should execute next. This scheduler is invoked whenever an event occurs. It may lead to interruption of one process by preemption.


© 2008-2013 by IndiaBIX™ Technologies. All Rights Reserved | Copyright | Terms of Use & Privacy Policy

Contact us: info@indiabix.com     Follow us on twitter!